Jiangsu Dreibo new energy automobile manufacturing new plant covers an area of 600 mu, with a total construction area of about 230000m2.
Construction unit: Pizhou High-tech Zone Economic Development Construction Co., LTD
Supervision unit: Xuzhou Huasheng Construction Engineering Supervision Co., LTD
Construction unit: Jiangsu Yongcheng Construction and Installation Co., LTD
Jiangsu Yongcheng Construction Group Co., LTD. Construction projects:
Project name | Structural form | Number of floors | Building height M | Building area M2 |
Office building | Independent foundation/frame construction | 5 | 16.35 | 7467.82 |
Mess hall | Independent foundation/frame construction | 2 | 10.05 | 7014.57 |
1# final assembly workshop | Independent foundation/steel structure, grid frame | One-storey factory building | 18.9 | 19440 |
2# final assembly workshop | Independent foundation/steel structure, grid frame | One-storey factory building | 18.9 | 19440 |
Outdoor ancillary works | Road engineering, water supply and drainage engineering, pipe network engineering, street lamp engineering and sporadic small projects |
Last: Xuzhou nature Desenburg wood industry project
Next: Fengxian Sunlou street wooden staircase industrial park construction project |